UK SBS PR17001 ESS High Beta Cavity Testing
What the buyer wrote
As part of the UK's in-kind contribution to the European Spallation Source (ESS) project, STFC Daresbury Laboratory are committed to perform qualification tests and delivery of 84 (+ 4) high-β dressed cavities by the end of June 2020. The Vertical Test Facility (VTF) in which these cavities will be tested requires a Helium Plant capable of producing superfluid helium at 2K with a warm gas recovery system. The warm gas recovery system will manage the recovery of gas from the return of the Cryostat to either medium or high pressure storage or a combination of both. This specification details the requirements for the supply of two pressure vessels suitable for storage of helium gas, one for m…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- UK SBS PR17001 ESS High Beta Cavity Testing
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Mar 2017
- Work ends
- 6 Feb 2018
Who the buyer named
Karl Oakley was the named contact on this notice.
