UK SBS PR20077 CLARA X-band High Power RF Distribution System
What the buyer wrote
The final date and time for the submission of bids is 18/09/2020 at 11:00 BST. DO NOT apply directly to the buyer. All tender information MUST be submitted through the Delta eSourcing Portal. Brief Description of Requirement A next-generation light source test facility is to be constructed at the Science and Technology Facilities Council's (STFC) Daresbury Laboratory, which will be known as CLARA (Compact Linear Accelerator for Research and Applications). The aim of the CLARA project is to develop a normal conducting test accelerator capable of generating longitudinally and transversely bright electron bunches and to use these bunches in the experimental production of stable, syn…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- UK SBS PR20077 CLARA X-band High Power RF Distribution System
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 28 Oct 2020
- Work ends
- 30 Mar 2021
Who the buyer named
The buyer published a contact address on this notice.
