UKBF Manchester Airport T2 Extension - Design Team & Technical Assurance
Home Officeservices
What the buyer wrote
Functional and technical assurance for proposed BF accommodation and design services for BF equipment infrastructure are required for the port operator led re-development of Manchester terminal 2.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- UKBF Manchester Airport T2 Extension - Design Team & Technical Assurance
- How they are buying
- The buyer did not say
- Type
- services
- Work starts
- 30 Jun 2016
- Work ends
- 30 Nov 2016
- Kind of work
- Architecture, engineering and surveying
Who the buyer named
Steven Ho was the named contact on this notice.
