What the buyer wrote
This work is to install new optical fibres at Boulby mine to serve the current STFC underground lab facility and to prepare for a future facility AIT-NEO. The work involves designing brackets to support the optical fibres in the main number 2 shaft at Boulby mine, then installing these brackets and then the optical fibres - all working alongside existing mining operations and adhering to local health and safety systems.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- UKRI-1054 - Optical Fibre Installation
- How they are buying
- The buyer did not say
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 22 Oct 2020
- Work ends
- 4 Jun 2021
Who the buyer named
The buyer published a contact address on this notice.
