UKRI-1404 R80 Tower Decommissioning and Adiabatic Cooler Design and Build
What the buyer wrote
The Contractor will be responsible for all civil, mechanical, electrical construction; installation and commissioning of the following – but not limited to - within the CDM Works area (i.e., The R80 roof area) and in accordance with the Completion Dates (TBC). •8No New Adiabatic coolers (AC’s). •Connecting pipework and fittings to and the new AC’s within the CDM Works Area. •All types of valves (isolation, regulating, non-return either manual or actuated). •Commissioning sets and pressure reducing valves. •Testing and drainage points. •Basket and other Filters. •All steel support work for the Adiabatic Coolers •All pipework supports. •All local electrical power and signal cabling with cable …
Details
- What the buyer calls it
- UKRI-1404 R80 Tower Decommissioning and Adiabatic Cooler Design and Build
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
Who the buyer named
The buyer published a contact address on this notice.