Skip to the main content
The Crier

UKRI-2862 Installation of Fibre to provide Resilient Connectivity to Underground Areas

Your saved contracts

What the buyer wrote

STFC Boulby lab operates at Boulby mine – a working Polyhalite and Salt Mine run by ICL-UK in the North East of England. This optical fibre installation work will install a secondary cable in the main mine shaft and two further cables underground, one attached to the roof of the mine tunnel between the existing laboratory and the new site and the second in a channel in the floor of the mine tunnel between the two locations. This will provide a diverse network with built in redundancy should one cable be damaged.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Details

What the buyer calls it
UKRI-2862 Installation of Fibre to provide Resilient Connectivity to Underground Areas
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Type
goods

Who the buyer named

The buyer published a contact address on this notice.

monitoringservicesprocurement@innovateuk.ukri.org