Skip to the main content
The Crier

Urgent replacement of Civic boiler

Your saved contracts

What the buyer wrote

The civic boiler room plant is now end of life and requires replacement as this will be a health & safety issue. The current heating system has limited control and was only a stop gap until completion of the original project. The boilers are in danger of major fail. 5 of the 9 modules have now fully failed. If we lose another module the water temperature will drop into a dangerous legionella risk zone and the system will have to be shut down leaving the civic, civic suite & courthouse with no heating. The system will also require a full chlorination.

Bid for this and lost? There is a short window in which the decision can be questioned.

Details

What the buyer calls it
Urgent replacement of Civic boiler
How they are buying
The buyer did not say
Where
in the East of England

Who the buyer named

The buyer published a contact address on this notice.

procurementops@southend.gov.uk