What the buyer wrote
The civic boiler room plant is now end of life and requires replacement as this will be a health & safety issue. The current heating system has limited control and was only a stop gap until completion of the original project. The boilers are in danger of major fail. 5 of the 9 modules have now fully failed. If we lose another module the water temperature will drop into a dangerous legionella risk zone and the system will have to be shut down leaving the civic, civic suite & courthouse with no heating. The system will also require a full chlorination.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Urgent replacement of Civic boiler
- How they are buying
- The buyer did not say
- Where
- in the East of England
- Kind of work
- Heating, plumbing and mechanical
Who the buyer named
The buyer published a contact address on this notice.
