VIVID - Supply and Install External Fire Escape and Associated Fire Safety Work

VIVIDworks
Your saved contracts

What the buyer wrote

The work specified is required for the design, manufacture and installation of a prefabricated steel external fire escape by a named sub-contractor. The staircase is to serve the 1st floor flats and to be installed to the opposite end of the corridor to existing staircase. Excavation and construction of ground slab and pad foundations. Cutting openings for and forming fire escape door/window openings and installing doors and frames. External landscaping and pathway formation. Provision of escape lighting to the staircase. The property is located in Farnborough For the full SOW and Preambles please use the user guide and follow the tender template to the pricing file. Subcontractors …

Read all of it on Contracts Finder →

Details

What the buyer calls it
VIVID - Supply and Install External Fire Escape and Associated Fire Safety Work
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
1 Nov 2018
Work ends
29 Mar 2019

Who the buyer named

Samantha Coonan was the named contact on this notice.