Skip to the main content
The Crier

W65 Stanley Ferry Bridge Concrete Survey and Testing June 2018

Your saved contracts

What the buyer wrote

Stanley Ferry Bridge carries Ferry Lane over a non-navigable section of the River Calder adjacent to Stanley Ferry Marina. The requirement for detailed concrete inspection and testing has been determined from previous inspections by Wakefield Council. Survey and testing works include: - i. Sounding survey and visual location of defects. ii. Half-cell potential survey. iii. Cover meter survey. iv. Measurement of carbonation depth. v. Sampling and determination of chloride ion content level in hardened concrete. vi. Endoscope survey. vii. Reporting. To carry out the survey and testing works the Contractor will provide and have full responsibility for traffic safety and manage…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Route One Infrastructure Limited£22.9kends (30 Sep 2018)

Details

What the buyer calls it
W65 Stanley Ferry Bridge Concrete Survey and Testing June 2018
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
2 Sep 2018
Work ends
30 Sep 2018

Who the buyer named

Karen Towers was the named contact on this notice.

Ktowers@wakefield.gov.uk