What the buyer wrote
The Design, Scheduling and material call-off of fabricated 4mm Alupanel XT A2 in Alunatur Elox Brushed Anodised. Take off existing panels to a central area; unload, distribute and install new panels. Install 50mm Duoslab to cover existing insulation - 5s/s fixings per 600x1200 slab.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Walthamstaw Stadium
- How they are buying
- Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 21 Nov 2018
- Work ends
- 2 Apr 2019