Washwood Heath Railway Systems Maintenance Depot (WWH) & Network Integrated Control Centre (NICC) for HS2 Phase One
HS2 Ltdworks
What the buyer wrote
Washwood Heath Depot (WWH) & Netwoirk Integrated Control Centre (NICC)
Details
- What the buyer calls it
- Washwood Heath Railway Systems Maintenance Depot (WWH) & Network Integrated Control Centre (NICC) for HS2 Phase One
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- works
Who the buyer named
The buyer published a contact address on this notice.
