Skip to the main content
The Crier

Wave Hub Installed Asset ROV & Bathymetry Survey 2017

Your saved contracts

What the buyer wrote

Wave Hub is the world's largest and most technologically advanced facility for pre-commercial demonstration of wave energy converter arrays. The site is located approximately 10 nautical miles (16km) from Hayle on the north coast of Cornwall. A marine visual and bathymetric survey of the subsea cable system is required during summer 2017. The full ITT may be downloaded from: https://www.wavehub.co.uk/about-us/tender-opportunities Outline Project Scope: To complete high resolution multibeam bathymetric survey to IHO Order 1A or better and clear ROV visual survey of the installed wave hub offshore electrical infrastructure and protection measures from minimum KP3.84 (19m below LAT…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Rovco Limited£104.4kends (1 Sep 2017)

Details

What the buyer calls it
Wave Hub Installed Asset ROV & Bathymetry Survey 2017
How they are buying
The buyer did not say
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
9 Jul 2017
Work ends
1 Sep 2017

Who the buyer named

Marine Operations Manager was the named contact on this notice.

info@offshoremm.com