WCC Japanese Knotweed Treatment Works (Bermuda Connectivity)
What the buyer wrote
The proposed Bermuda Connectivity Scheme comprises a 1.5km highway improvement involving realignment and widening to upgrade an existing highway and re-opening a section of abandoned highway and overbridge. The site is located approximately 1.5km south of Nuneaton town centre and 2.5km north of Bedworth town centre in Warwickshire. The proposed overall scheme will involve an improved highway link between West Nuneaton and the A444 Griff Roundabout. The scheme follows Bermuda Road in a southerly direction before curving round to the east and connecting with The Bridleway (west of the A444 Bermuda Bridge). From here, the scheme crosses the A444 (Griff Way) via the overbridge and connects with…
Details
- What the buyer calls it
- WCC Japanese Knotweed Treatment Works (Bermuda Connectivity)
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Work starts
- 7 Jul 2019
- Work ends
- 26 Jul 2019
Who the buyer named
Matthew Wallbank was the named contact on this notice.
