Skip to the main content
The Crier

Wimbledon Chase - Heating System Replacement

Your saved contracts

What the buyer wrote

Replace present boiler and burner arrangement with an efficient load matched system with plate heat exchanger (e.g. Potterton boilers and Reillo burners). Adjust flue to suit. Install pressurization unit and expansion vessel on primary side of plate heat exchanger (boiler side). Replace all isolation, balance and DRV valves together with gauges. Replace heating pumps. Replace all insulation with foil wrapped 30mm rock wall, or similar approved.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Advanced Control Solutions£122.9kends (2 Sep 2019)

Details

What the buyer calls it
Wimbledon Chase - Heating System Replacement
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
22 Jul 2019
Work ends
2 Sep 2019

Who the buyer named

Amy Gibson was the named contact on this notice.

amy.gibson@merton.gov.uk