Skip to the main content
The Crier

Wirral Dock Bridges Replacement

Your saved contracts

What the buyer wrote

<i>Replacement of key highway infrastructure (two bridges) on a principal road. An existing steel truss opening bridge will be replaced with a new steel box girder bascule bridge. An existing fixed truss bridge will be replaced with a new concrete fixed deck bridge. These bridges form a vital link in the Wirral strategic road network, facilitating access to the Port of Liverpool (Birkenhead), and major regeneration sites. The bridges are of particular importance as they form part of the Merseyside Freight Network, providing a key link between the Twelve Quays ferry terminal, the M53 Motorway and the Mersey Tunnels. </i><i>Wirral Council requires a design and build Contractor and seeks to sig…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Wirral Dock Bridges Replacement
How they are buying
The buyer did not say
Type
works
Work starts
1 Mar 2016
Work ends
31 Aug 2019

Who the buyer named

The buyer published a contact address on this notice.

tenders@wirral.gov.uk