Skip to the main content
The Crier

Wood Bridge - Repair

Your saved contracts

What the buyer wrote

North Yorkshire County Council wishes to appoint a contractor to carry out the Timber Repair of Wood Bridge, Ripon Works will consist of: - Removal of the old bridge timber and fixings - Replacement of the existing grout caps on the concrete piers. - Supply of new bridge and fixings detailed in contract drawing 004 - Installation of new timber and fixings as specified. - TM - Pedestrian closure of the bridge for the duration of the works - Road closure of the ford and signed diversion. (as and when required)

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Hinko Construction Ltd£51kends (6 Mar 2020)

Details

What the buyer calls it
Wood Bridge - Repair
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
27 Feb 2020
Work ends
6 Mar 2020

Who the buyer named

Alison Dickinson was the named contact on this notice.

alison.dickinson@northyorks.gov.uk