Skip to the main content
The Crier

Woodford Park Lake Regeneration

Your saved contracts

What the buyer wrote

Redistribution of silt within lake, installation of Nicospan membranes, coir roles, lake bank repairs, boardwalk and platforms. Work comprises work to the lake at Woodford Park and includes: a. Removal of tree stumps including roots from various points along the lake edge. b. Repairs to the banks damaged by stump removal and other damaged areas using brushwood faggots and/other systems with dredged arisings plus imported topsoil to backfill ready for planting. c. Dredging of the silt in the western and central part of the lake and deposition of that silt to the eastern side behind a nicospan barrier. d. Installation of timber deck and boardwalk with steps, handrail and dipping pl…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Ebsford Environmental Ltdends (29 Mar 2019)

Details

What the buyer calls it
Woodford Park Lake Regeneration
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
2 Dec 2018
Work ends
29 Mar 2019

Who the buyer named

Kevin Murray was the named contact on this notice.

kevin.murray@woodley.gov.uk