What the buyer wrote
Redistribution of silt within lake, installation of Nicospan membranes, coir roles, lake bank repairs, boardwalk and platforms. Work comprises work to the lake at Woodford Park and includes: a. Removal of tree stumps including roots from various points along the lake edge. b. Repairs to the banks damaged by stump removal and other damaged areas using brushwood faggots and/other systems with dredged arisings plus imported topsoil to backfill ready for planting. c. Dredging of the silt in the western and central part of the lake and deposition of that silt to the eastern side behind a nicospan barrier. d. Installation of timber deck and boardwalk with steps, handrail and dipping pl…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Woodford Park Lake Regeneration
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 2 Dec 2018
- Work ends
- 29 Mar 2019
Who the buyer named
Kevin Murray was the named contact on this notice.
