Works required for Boiler 3 - Remove and replace pass tubes
What the buyer wrote
The Scope of works are as follows. • Submit acceptable RAMs before start of job commences • Remove 121 2nd pass tubes (50mm OD x 3.2mm x 3200mm)swelled 1/16” at one end • Remove 148 3rd pass tubes (50mm OD x 3.2mm x 3980mm) swelled 1/16” at one end • Ensure tube plates is prepared ready for new tube install and co-ordinate with insurer for inspection, if required • Clean up tube holes • Supply 121 2nd pass tubes (see above) • Supply 148 3rd pass tubes (see above) • Fit a total of 269 tubes by expansion into tube plates • Carry out hydraulic test on completion to manufacturing specification Additional information: A link to the opportunity, please submit queries to the portal.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Works required for Boiler 3 - Remove and replace pass tubes
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 19 Jun 2016
- Work ends
- 30 Jun 2016
- Kind of work
- Heating, plumbing and mechanical