Appointment of a Lead Design Consultant for the Design of a Leisure Facility at Hartlepool Waterfront
What the buyer wrote
Hartlepool Borough Council is seeking an organisation to provide lead designer consultancy services for the full design and delivery of a new leisure facility with swimming pools. The lead designer will be expected to provide the full range of building services. including, but not limited to the following: • Lead consultant for the building element including the role of Principal Designer • Architectural design • Structural engineering for the pool and building • Civil engineering (for building drainage, etc.) • Mechanical and electrical engineers • Specialist swimming pool related consultants • Access Consultant • Acoustician • Fire Safety Consultant The exter…
Details
- What the buyer calls it
- Appointment of a Lead Design Consultant for the Design of a Leisure Facility at Hartlepool Waterfront
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Oct 2020
- Work ends
- 31 Dec 2024
Who the buyer named
Karen Cooper was the named contact on this notice.
