Skip to the main content
The Crier

Aqueduct Road Bridge Footway Strengthening Works

Your saved contracts

What the buyer wrote

The proposed works involve replacing part of the existing footway widening's with a reinforced concrete deck and reinforced concrete beams along with new vehicle parapets and guardrails to the South end of the bridge and trief kerbs with guardrails at the North end of the bridge along with all associated carriageway and footway resurfacing works.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

William Pye Limited£128.8kends (29 Sep 2016)

Details

What the buyer calls it
Aqueduct Road Bridge Footway Strengthening Works
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
18 Jun 2016
Work ends
29 Sep 2016

Who the buyer named

Peter Hughes was the named contact on this notice.

peter.hughes@blackburn.gov.uk