What the buyer wrote
The proposed works involve replacing part of the existing footway widening's with a reinforced concrete deck and reinforced concrete beams along with new vehicle parapets and guardrails to the South end of the bridge and trief kerbs with guardrails at the North end of the bridge along with all associated carriageway and footway resurfacing works.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Aqueduct Road Bridge Footway Strengthening Works
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 18 Jun 2016
- Work ends
- 29 Sep 2016
Who the buyer named
Peter Hughes was the named contact on this notice.
