Blackpool and the Fylde College Replacement Flooring to University Centre Hub
What the buyer wrote
NATURE OF THE WORK: Replacement of existing flooring to the UC Hub Building LOCATION: UC Hub Building, Blackpool and The Fylde College, Bennett Avenue, Blackpool, FY1 4EE Prepare the existing floor structure to the whole of the working area and provide and install Ardex Arditex NA latex screed to same and provide and install Forbo Surestep Stone non-slip flooring to manufactures instructions and to an approved colour. Bond same in position and hot weld all joints. Allow for sealing to all edges with silicon approved by flooring manufacturer and leave totally complete. Contractor is to price for 2no. colours from the Forbe Surestep Stone range to principally match the existing two colour …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Blackpool and the Fylde College Replacement Flooring to University Centre Hub
- How they are buying
- The buyer did not say
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 26 Jul 2015
- Work ends
- 7 Aug 2015
- Kind of work
- Supplies and catering, Refurbishment and fit-out
Who the buyer named
Paul Lindley was the named contact on this notice.
