Brooksby Incinerator Phase 1 - Testing and Investigation
What the buyer wrote
Procurement of a contractor with experience of incinerator systems is required for Phase 1 - Testing and Investigation works. The scope of works for Phase 1 is detailed below: • System familiarisation for engineers • Confirm operation and communication of all Control systems, PLC's and HMI's NOTE: Loading area HMI to be reconfigured. • Check operation of all system components: Fans, pumps, instruments, kiln rotation, filer unit, CEMS, loading equipment etc. Test in manual from the control room PC where possible • Confirm that all sensors and feedback are received at the control PC. • Produce a report To ensure the Brooksby Building meets its full operational requirements and satisfies …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Brooksby Incinerator Phase 1 - Testing and Investigation
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Where
- in the South East
Who the buyer named
Holly Collen was the named contact on this notice.
