Skip to the main content
The Crier

Brooksby Incinerator Phase 1 - Testing and Investigation

Your saved contracts

What the buyer wrote

Procurement of a contractor with experience of incinerator systems is required for Phase 1 - Testing and Investigation works. The scope of works for Phase 1 is detailed below: • System familiarisation for engineers • Confirm operation and communication of all Control systems, PLC's and HMI's NOTE: Loading area HMI to be reconfigured. • Check operation of all system components: Fans, pumps, instruments, kiln rotation, filer unit, CEMS, loading equipment etc. Test in manual from the control room PC where possible • Confirm that all sensors and feedback are received at the control PC. • Produce a report To ensure the Brooksby Building meets its full operational requirements and satisfies …

Read all of it on Find a Tender →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Details

What the buyer calls it
Brooksby Incinerator Phase 1 - Testing and Investigation
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Where
in the South East

Who the buyer named

Holly Collen was the named contact on this notice.

holly.collen@pirbright.ac.uk