Skip to the main content
The Crier

Camel Footbridge Wadebridge Maintenance and Repair

Your saved contracts

What the buyer wrote

The Camel Footbridge carries the maintainable public footpath over the River Camel between Egloshayle Road and Wadebridge Town centre. The structure consists of a two span cable stayed suspension bridge. The total length is 62m with a main span of 40m. The bridge tower support is founded within the River bed and extends 16m high above the deck. The bridge consists of a steelwork deck frame and tower with timber decking and aluminium balustrading. The deck is suspended from 8 pairs of steel cables (16 cables and 32 connectors). The project aim is to undertake major maintenance works on the cable stay Camel footbridge in Wadebridge safeguarding the structure for continued use. The intention…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Camel Footbridge Wadebridge Maintenance and Repair
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
31 Mar 2020
Work ends
30 Sep 2020

Who the buyer named

Tim Hack was the named contact on this notice.

tim.hack@corservltd.co.uk