Construction of Footbridge at Colliers Meadow Culmstock
What the buyer wrote
Culmstock Parish Council own a small riverside meadow, donated by the Collier family, on the east bank of the Culm river, opposite The Strand, Culmstock, and wish to make it accessible to locals and visitors. The proposed site, opposite an existing war memorial to the south of The Strand was located as the preferred location for the new bridge (see drawing B6 CPC.184.01_Rev.11_Footbridge Plan). This contract is for the engineering design, supply and construction of the bridge and is subject to successful grant application for the funding of the project.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Construction of Footbridge at Colliers Meadow Culmstock
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 30 Apr 2018
- Work ends
- 31 Oct 2018
- Kind of work
- New build construction, Civil engineering and groundworks
Who the buyer named
Rebecca Addis was the named contact on this notice.
