Skip to the main content
The Crier

Construction of Footbridge at Colliers Meadow Culmstock

Your saved contracts

What the buyer wrote

Culmstock Parish Council own a small riverside meadow, donated by the Collier family, on the east bank of the Culm river, opposite The Strand, Culmstock, and wish to make it accessible to locals and visitors. The proposed site, opposite an existing war memorial to the south of The Strand was located as the preferred location for the new bridge (see drawing B6 CPC.184.01_Rev.11_Footbridge Plan). This contract is for the engineering design, supply and construction of the bridge and is subject to successful grant application for the funding of the project.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Beaver Bridges Limited£79.2kends (31 Oct 2018)

Details

What the buyer calls it
Construction of Footbridge at Colliers Meadow Culmstock
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
30 Apr 2018
Work ends
31 Oct 2018

Who the buyer named

Rebecca Addis was the named contact on this notice.

raddis@middevon.gov.uk