Skip to the main content
The Crier

Cryogenic Plant - Design Study - Multi Year

UK Fusion Energy LtdSouth Eastservicesabove threshold
Your saved contracts

What the buyer wrote

UK Industrial Fusion Solutions Ltd (UKIFS), is seeking to select a suitable supplier for the provision of Design Study services for Cryogenic Plant, over multiple years. UKIFS is seeking industrial experts to assist with the transition from concept development to preliminary design level of the STEP Cryogenic Plant. The STEP cryogenics system is currently in the concept design phase, with the aim of producing a preliminary design for the cryogenic cooling systems for the STEP Prototype Plant (SPP). To view this notice, please click here: https://ukifs.delta-esourcing.com/delta/viewNotice.html?noticeId=996771495

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Air Liquide Advanced Technologies£935.3kends (31 Mar 2029)

Details

What the buyer calls it
Cryogenic Plant - Design Study - Multi Year
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Work starts
16 Dec 2025
Work ends
31 Mar 2029
Where
in the South East

Who the buyer named

Operational Procurement was the named contact on this notice. Questions closed on 7 Oct 2025, 13:00 BST.

operationalprocurement.step@ukifs.uk