What the buyer wrote
The required works are for a feasibility study into an upgrade of the J52 power supplies, supplied and commissioned by JEMA, which will be repurposed for the MAST-U D15 project. The study will determine the technical and practical requirements for optimising the power supplies to operate within MAST-U parameters. This activity is required to confirm that the proposed modifications are technically feasible, to ensure that the modifications meet the performance requirements of the MAST-U PINIs and to define the specific modifications necessary to achieve the desired upgrade.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- D15 Project Feasibility Study
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Where
- in the South East
- Kind of work
- Structural and civil engineering consultancy
Who the buyer named
Jim Ennis was the named contact on this notice.
