Skip to the main content
The Crier

Early Works for the Lower Thames Crossing - North Portal and Tunnelling Spoil Disposal

Highways EnglandSouth Eastworks
Your saved contracts

What the buyer wrote

The Lower Thames Crossing project comprises of two bored tunnels beneath the River Thames with interconnecting link roads to the M25, A13 and A2. At 16 metres in diameter, the tunnels will be some of the largest bored tunnels in the world. The crossing will feature three lanes in both directions with a maximum speed limit of 70mph. At circa 2.4 miles each the tunnels will be the longest in the country. The tunnel's north portal site (the "North Portal") will be located on the north shore of the Thames east of the old Tilbury B Power station site and south of the Tilbury loop railway line. The north Portal structure and its approach ramp is to be constructed within a sizeable excavation. Appr…

Read all of it on Find a Tender →

Bid for this and lost? There is a short window in which the decision can be questioned.

Details

What the buyer calls it
Early Works for the Lower Thames Crossing - North Portal and Tunnelling Spoil Disposal
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Type
works
Where
in the South East

Who the buyer named

The buyer published a contact address on this notice.

Rebecca.Jones2@highwaysengland.co.uk