GB-Leeds: HCON00429 - Supply, Installation and Maintenance of a Speed Gate/Lane Access Control System
What the buyer wrote
It is the intention of HSCIC to enhance and modernise the physical security of the estate through the phased introduction of turnstile access control systems at our key office locations which will be capable of controlling access and egress to buildings. The project will be coordinated by HSCIC as part of the introduction of a physical security strategy and will be implemented in the following office sites: •Leeds, Trevelyan Square •Leeds, Vantage House •Leeds, Bridgewater Place •Leeds, Whitehall Quay •Exeter, Hexagon House We require the supply and installation of a physical security access control system which meets our specified requirements to be piloted at two of our Leeds…
Details
- What the buyer calls it
- GB-Leeds: HCON00429 - Supply, Installation and Maintenance of a Speed Gate/Lane Access Control System
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 4 Jan 2016
- Work ends
- 31 Mar 2016
- Kind of work
- Security guarding and monitoring
Who the buyer named
Commercial Delivery was the named contact on this notice.
