GB-London: Feasibility Study into East Wing Switchboard Replacement

Your saved contracts

What the buyer wrote

The Contractor will need to carry out a detailed feasibility report for the replacement of the East Wing switchboard. •Establish locations for data logging to measure power consumption. •Undertake a detailed site survey to establish the load centres save and the address and destination of all associated LV cables. •Establish size of current conductors and assess load characteristics to confirm compliance with current BS7671. •Map all cable routs into and out of the switch room including containment. •Develop a changeover philosophy and plan that enables service to be maintained to minimise shutdowns. •Consider the phasing of the works and execution. …

Read all of it on Contracts Finder →

Details

What the buyer calls it
GB-London: Feasibility Study into East Wing Switchboard Replacement
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
30 Jun 2019
Work ends
31 Oct 2019