What the buyer wrote
The Ash Road Bridge (‘ARB’) Scheme comprises a long-term infrastructure solution to the current and future issues posed by the Ash level crossing, housing growth and enhanced rail use of the North Downs Line.The ARB Scheme forms Requirement 9 of Policy A31 of the ‘Guildford Borough Local Plan: strategy and sites 2015-2034’, adopted in April 2019 ('GBLP'). Policy A31 allocates land within Ash and Tongham, including land for the ARB Scheme, for approximately 1750 homes. Requirement 9 of Policy A31 is as follows: Land and provision of a new road bridge which will form part of the A323 Guildford Road, with an associated footbridge, to enable the closure of the level crossing on the A323 Guildfo…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- GBC - Construction of Ash Road Bridge
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- works
- Where
- in the South East
- Kind of work
- New build construction, Civil engineering and groundworks
Who the buyer named
Chris Wheeler was the named contact on this notice.
