The refurbishment work required involves: 1. Design a HV bushing compartment box to be made to suit the existing D8 10 MVA transformer on site 2. Draining of the oil in the bushing compartment 3. Replace the existing bushing compartment with this new box 4. Replace the HV bushing terminals 5. All installation activities associated with the above activities 6. Associated testing to enable the re-energisation