What the buyer wrote
UKFE is seeking to appoint a suitable Supplier (an individual organisation or a consortium with a lead supplier) for a services contract to provide a study for concept designs of Heating, Ventilation and Air Conditioning (HVAC) within the Tokamak building to be built at West Burton Power Station. The study shall provide the technical basis for the development of the facility HVAC architecture and ventilation strategy and shall inform the wider Tokamak Building design. The outputs of the study shall support the development of the building layout, contamination control strategy, nuclear ventilation philosophy, and the preparation of a Rough Order of Magnitude (ROM) cost estimate for the HVAC p…
Details
- What the buyer calls it
- HVAC concept-level study
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
Who the buyer named
Operational Procurement was the named contact on this notice. Questions closed on 29 Sep 2026, 12:00 BST.
