Skip to the main content
The Crier

Hypervapotron Repair Work

Your saved contracts

What the buyer wrote

Repair of the Hypervapotron Water Cooling Stub due to failed leak testing. The work will be undertaken by the OEM who has a unique knowledge of the original item with detailed understanding of the design and manufacture who has developed, trialled, tested and implemented the desired repairs in the fusion industry.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

PVA Industrial Vacuum Systems GmbH€285kends (31 Jan 2026)

Details

What the buyer calls it
Hypervapotron Repair Work
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Work starts
16 Oct 2025
Work ends
31 Jan 2026
Where
in the South East

Who the buyer named

Anthony Stratton was the named contact on this notice.

anthony.stratton@ukaea.uk