Skip to the main content
The Crier

ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement

Your saved contracts

What the buyer wrote

Design and Build of Work re. Incinerator Kiln Refractory Lining replacement for the Primary and Secondary Combustion Chambers. The scope of works will involve: • Detailed design and configuration of the new refractory lining and anchors based on the existing plant, drawings and documentation. • Supply and delivery of all refractory materials and anchors including any materials used for forming, moulding, and support structure (e.g. wood, polystyrene) and 1 tonne waste bags with sealable tops. • Deconstruction of existing refractory lining and Anchors (Disposal of waste by others) • Installation of the new anchors and refractory lining as per agreed detailed design. • Management of drying out…

Read all of it on Find a Tender →

Details

What the buyer calls it
ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
goods
Where
in the South East

Who the buyer named

Holly Collen was the named contact on this notice.

holly.collen@pirbright.ac.uk