The ISO 11 Incinerator was installed within the "Postmortem - Incinerator" (PMINCIN) building circa 1994/95 and much of the original plant remaining has now reached the end of its lifecycle. Following a period of unreliability throughout 2021, and the outcome of a Hazard and Operability (HAZOP) study during April 2022, the ISO 11 10-year life extension project was initiated, which has been approximately 50% delivered to date. Work Package 2: Control Panel replacement is currently in the design phase and a detailed design has been produced and the required Control HAZOP (CHAZOP study) completed for the proposed design.

Bid for this and lost? There is a short window in which the decision can be questioned.

Details

What the buyer calls it
ISO 11 Incinerator Life Extension: WP2 Control Panel Control HAZOP items to reduce operational risk to
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Where
in the South East

Who the buyer named

Holly Collen was the named contact on this notice.