ISO 11 Incinerator Life Extension: WP2 Control Panel Control HAZOP items to reduce operational risk to
What the buyer wrote
The ISO 11 Incinerator was installed within the "Postmortem - Incinerator" (PMINCIN) building circa 1994/95 and much of the original plant remaining has now reached the end of its lifecycle. Following a period of unreliability throughout 2021, and the outcome of a Hazard and Operability (HAZOP) study during April 2022, the ISO 11 10-year life extension project was initiated, which has been approximately 50% delivered to date. Work Package 2: Control Panel replacement is currently in the design phase and a detailed design has been produced and the required Control HAZOP (CHAZOP study) completed for the proposed design.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- ISO 11 Incinerator Life Extension: WP2 Control Panel Control HAZOP items to reduce operational risk to
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Where
- in the South East
Who the buyer named
Holly Collen was the named contact on this notice.