ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role
What the buyer wrote
This opportunity (“Contract”) is for a single supplier to provide: 1. Civil Works and CDM Principal Designer/Principal Contractor Role for the ISO11 Fumigation Lobby Replacement Project. 2. Conversion of Structural Engineer’s drawings to Construction Drawings. 3. Liaison with Local Authority to ensure compliance with Building Control. This will include providing drawings and information as required by the Local Authority and hosting them during site visits. Fees for Building Control will be paid for by The Pirbright Institute. 4. Construction of a Temporary Biocontainment Wall which will allow the area to be externalised from ISO11 to enable construction works to take place. The wall shal…
Details
- What the buyer calls it
- ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Where
- in the South East
Who the buyer named
Holly Collen was the named contact on this notice. Questions closed on 2 Sep 2026, 16:00 BST.
