L19106-T-JC Electrical installation works at London Luton Airport

Your saved contracts

What the buyer wrote

The existing panel board within Substation 21 has been continually expanded to a level where the ability to Bus couple or utilise a single generator is compromised, due to the loading on the panel. It is LLA's proposal to reduce the loading by moving critical supplies with minimal impact to a new substation location and then replace critical components within the existing substation. Additional information: Tender documents can be downloaded free of charge from In-tend. Responses must be provided on the tender documents provided. Is a Recurrent Procurement Type? : No

Details

What the buyer calls it
L19106-T-JC Electrical installation works at London Luton Airport
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
13 Feb 2020
Work ends
12 Feb 2021

Who the buyer named

The buyer published a contact address on this notice.