Skip to the main content
The Crier

Longrock Coastal Protection Culvert and Water Level Management

Your saved contracts

What the buyer wrote

Longrock Coastal Protection Scheme comprises several different elements of work that together are intended to provide coastal defence improvements, flood resilience and improved habitat areas. As part of a wider water level management plan for the area, it is proposed to make alterations to the existing culvert outfall from Marazion Pool. Part of the alterations will include installing a water level management device in front of the culvert, which will allow the water level within the pool to be raised by approximately 600mm when required. This tender is intended to obtain the design, supply and construction services for those works associated with the water level management facilities…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Longrock Coastal Protection Culvert and Water Level Management
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
22 Jul 2018
Work ends
1 Sep 2018

Who the buyer named

Mr Simon Mols was the named contact on this notice.

simon.mols@cornwall.gov.uk