What the buyer wrote
The project involves the painting of the Wainwright Railway Bridge as part of its scheduled planned preventative maintenance regime.The works includes the surface preparation of the existing steel substrate and painted surfaces to receive a new paint system and colour scheme.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Maintenance Painting Wainwright Way Railway Bridge
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 1 Nov 2020
- Work ends
- 26 Feb 2021
- Kind of work
- Civil engineering and groundworks
Who the buyer named
Peter Hughes was the named contact on this notice.
