Skip to the main content
The Crier

Maxwell Building 4th & 9th Floor WC Refurbishment Project

University of SalfordNorth Westworksbelow threshold
Your saved contracts

What the buyer wrote

The University is the single occupier of the Maxwell Building. The building houses professional services, teaching space and a canteen on the ground floor. The building is located centrally on the Peel Park campus and is the main campus reception. The WCs within scope include a Female WC located on the 4th Floor and a Male and Accessible WC on the 9th Floor. Overview of Works • Strip out and disposal of existing internal fixtures and finishes • Associated mechanical and electrical works • Plumbing/sanitary installations including wash basins, toilet basins, urinals and hand dryers. • Installation of WC cubicles • Refurbishment of ceiling, floor and wall finishes. • General decorations. The s…

Read all of it on Find a Tender →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

A.t. Nolan (Building Contractors) Limitedends (1 Sep 2025)

Details

What the buyer calls it
Maxwell Building 4th & 9th Floor WC Refurbishment Project
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
1 Jul 2025
Work ends
1 Sep 2025
Where
in the North West

Who the buyer named

The buyer published a contact address on this notice. Questions closed on 27 May 2025, 12:00 BST.

procurement-finance@salford.ac.uk