What the buyer wrote

Replacement of an existing arch bridge with precast concrete culverts and stone/ brickwork to form new parapets. The works briefly comprise: Protection of statutory undertakers apparatus Temporary works to control the watercourse Excavation and removal to tip of surfacing, the brick arch and existing fill material. Retaining the existing stone voussoirs for reuse Forming of foundation for new culvert units Installing new culvert units, including waterproofing and joint sealing Building up headwalls using existing stone voussoirs and Class A engineering bricks Backfill to the culvert units including inside the culvert units Road construction including kerbing and surfacing.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Wilf Noble Construction & Plant Hire Limited£47.8kends (4 Mar 2016)

Details

What the buyer calls it
Mechanics Institute Culvert Replacement Works
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Work starts
1 Feb 2016
Work ends
4 Mar 2016

Who the buyer named

Mr Graham Pearey was the named contact on this notice.