MIDRU Ground Floor Heat Pump Alteration Works
What the buyer wrote
MIDRU Ground Floor Heat Pump Alteration Works - The project includes the installation of new cooling air source heat pumps and alterations to the existing heating and cooling system at the MIDRU building at Heartland Hospital. The works are required to overcome the loss of a number of ground source heat pump boreholes that needed to be isolated to make way for the new ACAD building being constructed adjacent to the site. The isolation of the boreholes has been completed and the heating and cooling systems have been left operating in a temporary state until the new cooling systems has been installed. Additional information: The tender and associated documentation can be accessed on Bravo…
Details
- What the buyer calls it
- MIDRU Ground Floor Heat Pump Alteration Works
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 8 Dec 2020
- Work ends
- 8 Mar 2021
Who the buyer named
Chris Hannon was the named contact on this notice.
