What the buyer wrote
New Cut Canal Bridge carries the A642 over the Calder and Hebble Navigation in Horbury Bridge. The bridge is a single span masonry arch with reinforced concrete arch extension to the west side. The reinforced concrete arch was constructed in 1925 using the "Hennebique" system and was strengthened with a post tensioned reinforced concrete saddle in 1992. The refurbishment works to comprise: - • Masonry Section: comprising Arch intrados, east elevation (spandrels, parapet), north east and south east wing walls. Raking out and repointing localised areas of loose and friable mortar, recessed joints and open joints to the structure. Removal of all localised areas of moss and vege…
Details
- What the buyer calls it
- New Cut Canal Bridge Refurbishment
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 6 Oct 2019
- Work ends
- 1 Dec 2019
Who the buyer named
Miss Cloe Cunniff was the named contact on this notice.
