PHE - Corporate - E Block Humidification Plant Replacement
What the buyer wrote
This is a proposal to replace an existing humidification plant at PHE Chilton. The humidifier delivers controlled air moisture to the ventilation system supplying the entire interior volume of air to a block of biological studies laboratories. It is vital that laboratory environment conditions are consistent and reliable to ensure the highest levels of Home Office compliance. The existing humidifier has been in continuous 24/7 operation since 2008 and has exceeded the forecasted 10 year life cycle of the asset. The operating age of the humidifier has resulted in deterioration of the main water vessels and components parts which has increased the risk of system failures and potential …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- PHE - Corporate - E Block Humidification Plant Replacement
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 8 Sep 2019
- Work ends
- 20 Dec 2019
- Kind of work
- Heating, plumbing and mechanical
Who the buyer named
Richard Blake was the named contact on this notice.
