Skip to the main content
The Crier

Prototype Fast Reactor Structural Verification

Your saved contracts

What the buyer wrote

Inspect, calculate and determine the structural integrity of the PFR Turbine Hall and SGB structural steel frames to close out ONR Actions. Provide a methodology for maintenance and repairs, if any, that are required to ensure both areas are suitable for continued use.

Details

What the buyer calls it
Prototype Fast Reactor Structural Verification
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services

Who the buyer named

Sarah Brown was the named contact on this notice. Questions closed on 18 Dec 2025, 12:00 GMT.

sarah.2.brown@nrservices.uk