Skip to the main content
The Crier

SGT Blast Air Coolers

Your saved contracts

What the buyer wrote

UKAEA requires a contractor to design, supply and install 5 Blast Air Coolers which are suitable for outdoor installation and will operate without limitation. The Contractor shall decommission and deliver these coolers at a prearranged date and time onto the Client’s site. The Contractor will be required to install the Blast Air Coolers at an agreed, later date.

Bid for this and lost? There is a short window in which the decision can be questioned.

Details

What the buyer calls it
SGT Blast Air Coolers
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Where
in the South East

Who the buyer named

Anthony Stratton was the named contact on this notice.

anthony.stratton@ukaea.uk