STEP B1.3 Vacuum Vessel State of the Art and Best Practice Study
What the buyer wrote
This report is expected to produce a diverse selection of pressure vessel manufacturing methods; designed towards different process strengths and weaknesses which can be compared against pressure vessel codes to identify risks in technology readiness, manufacturing costs, manufacturing time, bottlenecks and dependent processes.
Details
- What the buyer calls it
- STEP B1.3 Vacuum Vessel State of the Art and Best Practice Study
- How they are buying
- The buyer did not say
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 22 Sep 2020
- Work ends
- 24 Sep 2020
Who the buyer named
Matt Burton was the named contact on this notice.
