STEP B1.3 Vacuum Vessel State of the Art and Best Practice Study
What the buyer wrote
This report is expected to produce a diverse selection of pressure vessel manufacturing methods; designed towards different process strengths and weaknesses which can be compared against pressure vessel codes to identify risks in technology readiness, manufacturing costs, manufacturing time, bottlenecks and dependent processes.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- STEP B1.3 Vacuum Vessel State of the Art and Best Practice Study
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 26 Oct 2020
- Work ends
- 1 Mar 2021
Who the buyer named
Ben Oborne was the named contact on this notice.