Skip to the main content
The Crier

UKAEA C8 Refurbishment for UKIFS on 1st & 2nd Floor

Your saved contracts

What the buyer wrote

The fit out of C8 is being designed by AtkinsRealis in liaison with both UKAEA and UKIFS for long-term tenanted occupation as part of the site-wide organisation of departmental placement, this is to aid the congregation of teams along with enabling the emptying of other buildings that are ear-marked for future demolition. It is being proposed that Kier Construction, who built C8 are awarded these fit-out works due to several critical technical, contractual, and risk-related factors, which ensures continuity, minimises risk, and aligns with stakeholder expectations.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Kier Construction Ltd£1.8mends (31 Mar 2026)

Details

What the buyer calls it
UKAEA C8 Refurbishment for UKIFS on 1st & 2nd Floor
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Work starts
27 Nov 2025
Work ends
31 Mar 2026
Where
in the South East

Who the buyer named

Ben Grainger was the named contact on this notice.

ben.grainger@ccfe.ac.uk