Skip to the main content
The Crier

Wakefield New Bridge Panel Replacement

Your saved contracts

What the buyer wrote

W58 Wakefield New Bridge carries the A61 Doncaster Road in Wakefield over the River Calder. The 5 span bridge comprises a reinforced concrete beam and slab deck of cantilever and suspended span construction on reinforced concrete abutments and piers. The bridge carries the main carriageway with an attached footbridge on the west side for pedestrian traffic. The carriageway on the bridge has 2 lanes for southbound vehicular traffic and 3 lane on the northbound side. The bridge is located in a conservation area. Some of the fascia panels on the downstream (east) elevation of the bridge have been displaced and lost during flooding conditions. Loose panels are to be re-fixed and missing …

Read all of it on Contracts Finder →

Details

What the buyer calls it
Wakefield New Bridge Panel Replacement
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
17 Feb 2020
Work ends
17 Apr 2020

Who the buyer named

Brian Thomas was the named contact on this notice.

brianthomas@wakefield.gov.uk